New Building

New Church Building

In 2019, the Lord graciously provided Northlake Bible Church with 11.5 acres of land located on Highway 407 across from Faught Road. This property was generously purchased by our sending church, Countryside Bible Church. Since then, God has faithfully continued to provide the financial resources necessary to move forward with developing the site for future ministry.

While Lance Thompson Elementary School has been a wonderful place for our church to gather, we are very excited for the possibility of having our own permanent place to worship very soon. It has always been our desire to root ourselves in this community as a beacon for the gospel not only for the immediate future but until our Lord returns!  A physical building will be an important part of making that desire a reality.

The building we are designing will allow us to not only gather for worship each Sunday, but will also include spaces designed for children’s ministry, youth ministry, adult discipleship and fellowship.

New Building Updates

Weekly Update 7/23/26
July 23rd, 2026
Ice and water shield going in and light poles/baptismal have been delivered! Photos, left to right: Getting all the islands filled around the parking lot with topsoil; Ice and water shield going on the roof before we do the standing seam to help keep the building protected; Got the light poles delivered today; Standing seam, metal roof being bent on site; Ice and water shield almost complete on S...
Weekly Update 7/17/26
July 17th, 2026
Starting to look more like a church! Photos, left to right: Stone delivered; Getting the front entry soffit in; Hanging the FPBs; Duct going up on second floor; More final grading of lot around building; More sheathing going up on north side of building; Getting all the exterior sheeting put up/starting to look more like a church.......
Weekly Update 7/9/26
July 9th, 2026
Parking lot ready for vehicles; and more sheathing! Photos, left to right: Parking lot is cured and ready for vehicles; Roof sheathing starting; Sheathing.......
Weekly Update 7/3/26
July 3rd, 2026
Lots of framing this week! Photos, left to right: Side view; Another view; Front of the church from the inside second floor; Sanctuary from inside; Interior door frames being set; Northside church entry being framed; Getting sheathing on front of church; Front entry all framed.......
Weekly Update 6/25/26
June 25th, 2026
Finishing parking lot and starting electrical. Photos, left to right: Starting metal decking on light gauge trusses; Approach from 407 all formed; Safety truck with flashing warning lights to block shoulder for workers to tie in approach from 407; New approach coming in off Hwy 407; Gas test station relocated outside concrete approach; Electrical wall rough started/all boxes going in on first floo...
Weekly Update 6/19/26
June 19th, 2026
Safety signage on 407, new temporary road, and trusses. Photos, left to right: Cutting the lines in the parking lot; Sheeting going up; Setting the last trusses; Compacting new temp road into site; New rock for temp road going in; Rock for temp road; First floor interior framing; First floor restrooms framed and plumbing rough in; Approach to 407 getting cut in; Safety signage and shoulder closed ...
Weekly Update 6/11/26
June 11th, 2026
Sprinkler and exterior sheathing has begun...and soon, another parking lot pour! Photos, left to right: Sprinkler system started; First floor restroom carriers going in; Sheathing on exterior has started; Rebar all in for another parking lot pour.......
Weekly Update 6/04/26
June 4th, 2026
A lot of progress this week with second floor and parking lot! Photos, left to right: Another early morning pour for second floor mezzanine; Pouring 2nd floor; Second floor; Second floor slab looks great; Pouring stairs and landings; Trusses starting to get set; 2 a.m. parking lot pour; Setting up laser for laser screed; Parking lot; Parking lot; Parking lot; Sprinkler pipe delivery; Setting up fo...
Weekly Update 5/28/26
May 28th, 2026
Progress with roof and parking lot - main roof is almost closed up! Photos, left to right: Pouring around columns; columns; Next step is trusses; Trusses just arrived; Unloading trusses.......
Weekly Update 5/20/26
May 20th, 2026
Progress with roof and parking lot - main roof is almost closed up! Photos, left to right: Metal decking being secured to purlins; Grease trap installed; steel in for folding partition wall; Saw cutting joints in what was recently poured; Wrapping up another late-night pour on parking lot; Parking lot; Another view of parking lot; Main roof almost closed up.......

Our Goal

By the Lord’s gracious provision through the means of your faithful and sacrificial giving we have met and exceeded our goal of four million dollars!

We are now finalizing plans with our builder and the Town of Northlake in order to move forward towards breaking ground on our new building as quickly as possible.  

It is truly remarkable to see how God has brought us to this point, and we are filled with gratitude and anticipation for what He will continue to do through Northlake Bible Church for His glory.
 
Thank you for your generosity, your prayers, and your partnership in this building project.  Further updates will be posted as we have more information.

Psalm 115:1
Not to us, O Lord, not to us, but to Your name give glory because of Your lovingkindness, because of Your truth.